Here we were asked to remove the old decking structure and help design a new layout that works better for the garden and still has access from the French doors. We first levelled off the area, and installed a timber framework using treated timbers and laid out a weed barrier.
We then installed the 8no Oak posts for the roof structure then the decking boards followed. With this project one of the main objectives was to reduce long term maintenance, so we installed a composite board from MillBoard. This is a great system that hides the fixings and has a really nice grain to it. It comes in a variety of finishes.
Next was the oak roof structure, we let the client seal it then we returned to install the toughened glass roof and guttering.